Brookfield Parks and Recreation
Register Now

Still River Greenway



Availability
Date:

12 am
1 am
2 am
3 am
4 am
5 am
6 am
7 am
8 am
9 am
10 am
11 am
12 pm
1 pm
2 pm
3 pm
4 pm
5 pm
6 pm
7 pm
8 pm
9 pm
10 pm
11 pm


= Unavailable     = Available
srg

Facility Information

63 Silvermine Rd
Brookfield, CT 06804


Status: Open

More about the Still River Greenway
This 3.3 mile lateral trail is generally considered an easy route. It takes an average of 1 hour to complete. The trail features a 10-foot wide paved surface, and a 170 foot prefabricated bridge over the Still River. It will provide a safe place for everyone to exercise: biking, walking, rollerblading, running. It is stroller friendly with no motorized vehicles permitted. The best times to visit this trail are March through November. Dogs are welcome, but must be on a leash.

Click here for the trail map.

2023 Still River Greenway survey results.

2019 Still River Greenway survey results.

Brookfield Still River Greenway Ad Hoc Committee: Term 8/1/2022- 8/1/2024
 Jay Annis                                 Chairman
Bohdan Dackow                       Member
Maureen Farrell                        Member
Jean Hartnett                           Member
James Diezemann                    Member
Laura Murphy                           Director, Brookfield Parks and Recreation